Just a thought for accross Canada that likely will never happen but makes sense. One of the biggest hurdles in cost for both electrical transmission and high speed rail is land acquisition. For long stretches of both it might be cost effective for these two groups to work together to use the same land. The power lines could meet with the high speed rail outside of cities and run above future rail expansion.
Just a thought for accross Canada that likely will never happen but makes sense. One of the biggest hurdles in cost for both electrical transmission and high speed rail is land acquisition. For long stretches of both it might be cost effective for these two groups to work together to use the same land. The power lines could meet with the high speed rail outside of cities and run above future rail expansion.